Yard Project Planner
The Yard Project Planner puts a whole yard project in one place. Add every bed, path and pad, pick a material for each, and get one combined shopping list — cubic yards, tons, bags and an estimated cost.
1Your areas
Measure each area in feet, set the depth in inches, and adjust the waste allowance if you need to. Everything updates as you type.
2Your shopping list
Totals are grouped by material, with waste included. Order quantities are rounded up to the nearest 0.1 cubic yard so you do not run short.
Optional. Published delivery bands run $50–$150 per trip — most yards charge one flat fee per load, so one trip usually covers a whole order.
Your project saves automatically in this browser and reloads when you come back. The share link carries the whole project — areas, materials, depths, waste and prices — so anyone opening it sees the same list.
How the Yard Project Planner works
Volume. Every area is converted to square feet first: length × width for a rectangle, π × (diameter ÷ 2)² for a circle, and base × height ÷ 2 for a triangle. Then:
- Cubic yards = square feet × depth in inches ÷ 324. The 324 comes from 27 cubic feet per cubic yard × 12 inches per foot.
- Weight. Tons = cubic yards × the material density below.
- Waste. Each area’s volume is increased by its waste allowance before totals are grouped, then the order quantity is rounded up to the nearest 0.1 cubic yard.
- Bags. Bag counts use standard 2 cu ft bags: 27 ÷ 2 = 13.5 bags per cubic yard, rounded up. Bags are shown for mulch, topsoil, compost, sand and gravel. Concrete is ordered by the cubic yard from a ready-mix truck, not by the bag.
Material densities used
| Material | Published range (tons / yd³) | Used here | Default waste |
|---|---|---|---|
| Mulch | 0.20–0.40 | 0.30 | 10% |
| Topsoil | 1.05–1.10 | 1.08 | 10% |
| Compost | 0.50–0.65 | 0.58 | 10% |
| Sand (dry) | — | 1.35 | 10% |
| Crushed gravel | 1.40–1.42 | 1.41 | 15% |
| Pea gravel | — | 1.25 | 15% |
| Concrete | — | 2.03 | 10% |
Waste defaults: 10% for mulch beds and topsoil, 15% for gravel paths and driveways (gravel settles and spreads thin at the edges), and 10% for concrete. Every area’s allowance is editable — uneven ground and irregular shapes need more.
Last verified: November 2026. Prices are 2026 bands from Angi, HomeGuide and Lawn Love — check with your local yard before ordering. Full formulas, density table, and assumptions: How We Calculate — YardMathPro Methodology.
Yard Project — Shopping List
| ✓ | Material | Order | Weight | Bags (2 cu ft) |
|---|
Areas and measurements are in the online planner. Quantities include each area’s waste allowance and are rounded up to the nearest 0.1 cubic yard.
How do I measure an irregular or curved bed?
Break it into simple shapes — rectangles, circles and triangles — and add each piece as its own area with the same material and depth. For a kidney-shaped bed, measure the longest length and the widest width, treat it as a rectangle, then reduce the result by about 20%, or split it into two or three rectangles that follow the curve. Slightly over-measuring is safer than running short, and the waste allowance covers the difference.
What waste percentage should I use?
Start with the defaults: 10% for mulch, topsoil, compost and concrete, and 15% for gravel. Go higher — 15–20% — for irregular shapes, sloped or uneven ground, and gravel that will be compacted. Material settles after watering and rain, so a bed spread at exactly 3 inches rarely stays at 3 inches. If you are matching an existing depth or topping up, 5% can be enough.
Should I buy in bulk or in bags?
Bags win on small jobs: under about half a cubic yard, bags are cleaner, easier to move, and there is no delivery fee. Bulk wins quickly after that — one cubic yard is 13.5 bags, and bulk material is usually far cheaper per yard even after a $50–$150 delivery fee. Bags also make sense when access is tight (no room for a dumped pile) or when you want to spread the work over several weekends.
How accurate are these totals?
The volume math is exact for the measurements you enter — the uncertainty is in the ground, not the formula. Depths vary across a real bed, soil compacts, and material densities vary by moisture and supplier (that is why densities are published as ranges). Treat the totals as a solid order quantity, not a guarantee: confirm the depth in a few spots with a ruler, and check your yard's own conversion if they sell by the ton.